L-j chart for 10 marks
"quality control" AND laboratory
Levey Jennings chart laboratory quality control Westgard rules
Control
result
↑
+3 SD ─────────────────────────────────────
+2 SD ─────────────────────────────────────
+1 SD ─────────────────────────────────────
Mean ───────────────────────────────────── Target mean
-1 SD ─────────────────────────────────────
-2 SD ─────────────────────────────────────
-3 SD ─────────────────────────────────────
1 2 3 4 5 6 7 → Day / run number
Example plot: ● ● ● ● ●
| Rule | Meaning | Main error detected |
|---|---|---|
| 1₂s | One value exceeds ±2 SD | Warning rule, investigate |
| 1₃s | One value exceeds ±3 SD | Random error, reject run |
| 2₂s | Two consecutive results exceed 2 SD on same side | Systematic error |
| R₄s | Difference between two controls in same run exceeds 4 SD | Random error |
| 4₁s | Four consecutive results exceed 1 SD on same side | Systematic error |
| 10x | Ten consecutive results on one side of mean | Systematic error or shift |